Y-Pipe Assembly Function

up pipe

If you wish to gain better fuel mileage, consider using a Y-Pipe Assembly for your exhaust system. The Y-Pipe Assembly Function, used in cars with (6), (8), or more cylinders with one tailpipe, serves to increase engine power by improving the flow of exhaust and lowering the temperatures of the exhaust gas. A properly functioning engine will produce waste products that must be routed out of the system. The Y-Pipe Assembly allows for this process.

Y-Pipe: What is Involved

The Y-Pipe Assembly Function supports an internal combustion engine for vehicles including trucks, cars and motorcycles. It removes waste gases from the engine through a set of pipes and manifolds. If it is faulty, the engine will not perform appropriately and the vehicle will have lower gas mileage. Following are the components that connect with the Y-Pipe Assembly to ensure it works properly:

The Exhaust Manifold is part of the exhaust system connects to the combustion cylinders of the engine and draws in the exhaust gases that build up as the engine runs. These exhaust gases are then sent to a collector that moves them throughout the exhaust system.

The Muffler is connected to the internal pipe system. Baffles within the Muffler reduces the noise that combustion creates as it leaves the exhaust pipe.

The Catalytic Converter finishes the combustion of the exhaust gases that escaped the engine’s combustion chamber. This helps reduce the possibility that carbon monoxide or nitrogen oxides will enter the atmosphere.

The tailpipe is the final part of the engine exhaust system that removes exhaust gases from the vehicle. The Y-Pipe connects it to the vehicle’s exhaust system.

Installing a Y-Pipe Assembly

First, make sure you check the pipe to make sure it is smooth. If not, sand it down until it fits securely. The vehicle needs to be jacked up with proper support and the negative battery terminal must be disconnected.

When removing the old Y-Pipe, loosen the front support bracket. After this, loosen the nuts on each bank and remove them from both the front and back. As you remove the Y-Pipe, make sure that the middle goose neck mount is the last part taken out.

As you install the new Y-Pipe, make sure to position the middle goose neck mount before continuing. Secure the new bolts. Overall, the process is simple and should take about an hour or so to complete.

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s